Projects
Waterworks Company Godziszka
Godziszka
- Delivery and installation of the water treatment plant for drinking water with a treatment capacity of 30 m³/h
- Eurowater solutions:
- drinking water oxydation and filtering - two NSB 200 pressure filters
- backwash – Becker blower and rinse pump
- dosing of coagulant and sodium hypochlorite - two DDC 6-10 AR dosing pumps
Zakład Rzeźniczo – Wędliniarski Ernestyn Janeta
Lubomia
- Installation of the trial Eurowater's water treatment plant for iron and manganese removal.
- Delivery and installation of the water treatment plant with a treatment capacity of 16 m³/h
- Eurowater solutions:
- water oxydation
- iron removal - two NSB 200 pressure filters
- manganese removal - two NSB 200 pressure filters
- SFH 602 two-tank softening plant
Norma Polska Sp. z o.o. Sławniów
Norma Group GmbH Department in Poland
- Steam-glycol heat distribution centers with automatic control
- Heating systems for warehouses and production halls
- Sondex brazed plate heat exchangers with a heating power of 75 kW, 90 kW and 160 kW
- LDM RV211 control valves with ANT40.11S actuators
- Spirax Sarco steam valves
Home heating, solar and water treatment systems
- Boiler rooms, solar systems, control modules
- Water treatment: filters, water softeners, reverse osmosis.
Orlen Asfalt Sp. z o.o.
Trzebinia
- Ecological installation for burning after-oxidation gases from asphalt production, with heat recuperation from exhaust gases
- Water treatment plants for steam generators
- Fuel oil circuit for asphalt storage tanks
- Continuous maintenance service.
Orlen Asfalt Sp. z o.o.
Płock
- Delivery of valves and equipment for asphalt oxidation system.
PRAXIMA Krakpol Sp. z o.o.
Kraków
- Steam boiler plant, power: 3,0 MW
- Eurowater's water treatment plant with the flow of 25 m3/h.
- Heat recuperation from condensate for process water heating, flow: 12 m3/h.
Zakłady Mięsne SZUBRYT
Chełmiec
- Steam boiler plant, power: 2,0 MW
- Water treatment plant for process and boiler feed water
- Water storage tank, capacity: 50.000 l
- The main pumping station
Zakłady Mięsne SZUBRYT
Nowy Sącz
- Steam boiler plant, power: 1,0 MW
- Water treatment plant for process and boiler feed water
- Water storage tank, capacity: 25.000 l
- The main pumping station
- Solar system installation – 15 solar panels for water heating
- Maintenance and technical support.
Norma France
Briey, France
- Delivery of 6 steam thermoforming units for fuel tubes production
- installation
- PLC programming.
Norma Polska Sp. z o.o. Sławniów
Norma Group GmbH Department in Poland
- Delivery of 98 steam thermoforming units for car fuel tubes production: manual, automatic and for the 'UREA' ecological project of exhaust gases reducing
- Steam boiler plant, power: 1,0 MW
- Chilled water circuit and eco-chillers with freecooling (power: 800 kW)
- Technological systems installation
- Water treatment plant with reverse osmosis
- Water filtering plant
- Heat exchangers selection, delivery and installation
- HVAC systems
- Water circuits with pumping station and fire protection system
- Air heating units for warehouse heating
- Industrial PLC programming
- Continuous maintenance and technical support.
Norma Grupa Jugoistocna Evropa
Subotica, Serbia
- Full technological design of steam, water, compressed air and chilled water systems for whole factory
- 12 standard manual steam thermoforming units for car fuel tubes production
- 8 automatic steam thermoforming units for car fuel tubes production
- Steam boiler plant, power: 1,0 MW
- Chillers with heat recuperation and freecooling, total power: 800 kW
- Water treatment plant with reverse osmosis
- Water filtering plant
- PLC programming
- Computer programs for delivered equipment
- Continuous maintenance and technical support.
Fablok Pierwsza Fabryka Lokomotyw w Polsce S.A.
Chrzanów
- Central heating installaton in railcars, model M212
Petrochemia Blachownia S.A.
Kędzierzyn Koźle
- Steam and condensate system installation for steam boiler plant of total capacity 2 x 25000 kg steam / hour.
- Central heating and hot water circuit installation
- Propane boiler plant for central heating, power: 190 kW.
Kronospan HPL S.A
Mielec
- Repair of 2 steam boilers, each of the capacity 25.000 kg steam / hour
- Boilers and tanks preparation for UDT (Office of Technical Inspection) approval.
Komagra Sp. z o.o.
Tychy
- Installation of water and steam system for steam boiler plant, flow: 50.000 kg steam / hour.
Krakowska Hodowla i Nasiennictwo Ogrodnicze POLAN Sp. z o.o.
Krzeszowice
- Water treatment plant, flow: 10 m3/h, purifying water for technological processes and boilers
- Water conditioning and disinfection system for greenhouse
- Implementation of heat measurement system for greenhouse
- Installation of automatic temperature control system for 12 greenhouses
- Implementation of the computer application for continuous monitoring and temperature control in 12 greenhouses.
Miejskie Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
Dąbrowa Tarnowska
- Water treatment plant servicing: technical support and water treatment chemicals supply.
Patrol Barter
Kraków
- Chillers servicing
- Modernization of chilled water system for extruders.
Produkcja i Hodowla Roślin Ogrodniczych PHRO
Krzeszowice
- Installation of Eurowater's vacuum deaerator with chemicals dosing system for central heating in greenhouses.
Śląskie Centrum Chorób Serca
Zabrze
- Water sterilization plant for hospital's sterilization room.
Telefonika S.A.
Kraków
- Design, delivery and installation:
- steam boiler plant, power: 10,0 MW
- steam boiler plant, power: 5 x 600 kW, with the feedwater treatment plant for boilers
- water boiler plant, power: 3,0 MW
- central heating boiler plant, power: 28, MW, for whole factory heating
- feedwater treatment plant for boilers, flow: 20 m3/h.
- Installation of compact heating nodes of 1,25 MW power.
Lubelskie Zakłady Drobiarskie LUBDROB
Lublin
- Eurowater's water treatment plant installation, flow: 8,0 m3/h, for boilers and technological processes:
- water softening
- dealkalization
- desorption
- chemicals dosage.
Przedsiębiorstwo Materiałów Izolacyjnych IZOLACJA - MATIZOL
Gorlice
- Steam boiler plant, capacity: 4.000 kg steam / hour - Thyssen Henschel GKW 4000 boiler
- Eurowater's feedwater treatment plant installation
- water softening
- dealkalization
- desorption
- chemicals dosage.
Gates Polska
Legnica
- Eurowater's feedwater treatment plant installation
- water softening
- dealkalization
- desorption
- chemicals dosage.
- Installation of Eurowater's water softening plant for chilled water system.
Car repair shop P.U. J. Gajda